Installation Scope & Caution Guidelines – AQUOSYS GRP Water Tanks

Safety. Precision. Reliability.
Proper installation is vital to the long-term performance and hygiene of your GRP water tank. At AQUOSYS Limited, we prioritize safe handling, site preparation, and post-installation practices to ensure our clients get durable, leak-proof, and hygienic water storage—whether for domestic, commercial, or industrial use.
📌 Scope of Installation Responsibility
1. Base Concrete Foundation – Client Responsibility
The client must prepare the base concrete foundation according to AQUOSYS engineering specifications and site-specific structural conditions.
Key Requirements:
Concrete strength: Minimum of 180 kg/cm²
Mortar leveling layer: Must not exceed 20mm in thickness
Flatness tolerance: Ensure accurate leveling for even load distribution
Anchor bolts: Supplied and installed by AQUOSYS or our approved agents
2. Nozzle & Piping Provisions
Nozzles (inlet, outlet, overflow, drainage) are installed by AQUOSYS, provided the client specifies their sizes and positions in advance.
Piping work, insulation around fittings, and final plumbing connections are the responsibility of the client.
3. Installation Clearance
Leave at least 600mm of open space on all sides of the tank for:
Routine inspection
Maintenance
Emergency access
⚠️ Installation Caution Guidelines
To ensure a smooth and safe installation process, please follow these precautions:
➤ During Transportation
DO NOT stack heavy loads on GRP panels during transit.
Use soft padding (e.g., foam, cloth) where ropes or straps contact the panels.
Avoid dragging panels across abrasive surfaces.
➤ During On-Site Installation
Protect nozzle fittings from pressure or torsion. Always start pipe connections from the tank side to minimize stress.
Do not allow piping to hang unsupported, as it could deform the nozzle joints.
Avoid open flames or hazardous work (e.g., welding) near tank panels—GRP is flame-resistant, not fireproof.
🔧 Maintenance Recommendations
To preserve the hygiene and function of your AQUOSYS tank:
Drain the tank completely if it is not going to be used for an extended period.
Inspect at least twice per year:
Check for leaks, deformation, and sediment build-up
Inspect internal and external reinforcement
Sanitize internal surfaces, especially for drinking water use
Monitor piping connections to ensure no stress or leakage occurs over time.
Ensure ventilation of the tank room to avoid excess humidity or pressure buildup.
🚛 Professional Support by AQUOSYS
AQUOSYS provides:
Foundation layout drawings
On-site supervision upon request
Installation training and user manuals
Annual maintenance plans
Our goal is to ensure every tank we deliver is safe, sanitary, and fully optimized for its intended purpose—no matter the environment.